Sale! WINGOIN Heavy Duty Dog Leash for Large Medium Small Dogs Reflective Tactical Dog Training Leash with Double Handles Poop Bag Holder Safety Buckle 6FT Long Lead for Dogs Walking Running Green
About this item Double handles: The heavy duty dog leash is equipped with 2 thickened padded handles, which are comfortable to hold and do not tire your hands. The long handle is suitable for daily dog walking, and the short handle is convenient for you to
$8.00
-
$6.40
Details
About this item
-
Double handles: The heavy duty dog leash is equipped with 2 thickened padded handles, which are comfortable to hold and do not tire your hands. The long handle is suitable for daily dog walking, and the short handle is convenient for you to train your dog and quickly control in emergencies.
-
Metal Buckle: The no pull dog leash uses double-layer high-strength nylon webbing and a sturdy metal buckle, which is durable and can be quickly connected to your dogs harness or collar without worrying about accidental breakage. The buckles 360 rotation design prevents tangling and is ideal for close-range public walks and hikes.
-
Poop Bag Holder: The 6 ft long dog leash comes with a poop bag holder attached to a D-ring. This convenient holder can store poop bags, dog treats, keys, coins, and more, making it easy to handle unexpected situations on your walks.
-
Reflective Strips: This service dog leash features dual reflective strips on both sides, enhancing visibility and safety. During nighttime walks, it allows you and your pet to be easily spotted, to protect you and your dogs safety
-
Car Safety Buckle: This nylon dog leash comes with a car seat belt buckle that securely fastens your dog in place while in the vehicle. It prevents your dog from moving freely, reduces distractions to the driver, and ensures a more comfortable and safer journey.
Shipping Info
- Cost: $25
- Free Shipping
- We offer free shipping on orders over $30. Please check the free - shipping eligibility at checkout.
- Delivery Time:
- It usually takes [3-5] business days for standard shipping. Please note that this is an estimated time frame and may be affected by local holidays, and unforeseen circumstances.

Reviews
There are no reviews yet.